When do you need building plans?
The City of Cape Town treats a water tank as "minor building work". Its guideline lists the tanks that need building plan approval before you install them:
- a single tank that holds more than 10,000 litres;
- a tank of more than 1,000 litres built on site, for example in brick or concrete;
- a tank of any size on a stand more than 1 metre above the ground;
- any other tank that the City's Building Control Officer decides needs approval.
| Your tank | Building plans? |
|---|---|
| A plastic tank of 5,000 L or less, on the ground | No |
| A single tank of 10,000 L, on the ground | No, if its rated capacity is 10,000 L or less. Check the label: some tanks hold a little more than the size they are sold as. |
| A single tank of 15,000 L or 20,000 L | Yes |
| Two to four linked tanks of 5,000 L, on the ground | The guideline counts each tank on its own, so on its wording, no. The Building Control Officer can still ask for plans. |
| Any tank on a stand more than 1 m high | Yes. You may also need a competent person, such as an engineer, to check the stand. |
| A brick or concrete tank over 1,000 L, built on site | Yes |
This is why our bigger systems use linked 5,000 L tanks on a slab. They fit through most gates, one tank can be cleaned while the others run, and they usually avoid a plan submission. Packages and prices
What do plans cost, and how long do they take?
A tank that needs plans goes in as a "minor building work" submission to the City, online.
- City fee, 2026/27: the minimum is R680 for a home and R1,100 for other buildings, including VAT. You pay it when you submit, and you don't get it back if the plan is refused.
- Documents: the SANS 10400 forms, a site plan and layout plan, the title deed and Surveyor-General diagram, structural drawings where needed, and the consent of your home owners' association or body corporate if you have one.
- Time: the City's target is 30 days for a complete submission. An approved plan is valid for 12 months.
Drawings, and an engineer where one is needed, cost extra. If your system needs plans, we arrange them for you. Plans are not part of our package prices.
Backflow protection: an RPZ valve or an air gap
If your tank connects to the mains, or if rainwater or borehole water can reach your house plumbing, the City requires backflow protection. This stops tank water from flowing back into the City's pipes.
The City accepts two methods: an RPZ (reduced pressure zone) valve, or an air gap. In the City's words, "non-return valves and standard stopcock valves are not sufficient". The equipment must be SABS-approved.
Rainwater or borehole water in the house
If you plumb rainwater, borehole or wellpoint water into the house, for example for toilets or laundry, you must apply to the City to install and use an alternative water system. You need:
- your latest municipal account;
- a diagram of the system that shows the RPZ valve;
- a registered plumber, and the plumber's certificate if the system is already in;
- separate pipes, and signs that show the water is not drinking water.
A City inspector then checks the system.
A rainwater tank that only feeds the garden or pool, through its own pump and hose, doesn't connect to the house plumbing. You don't need a plumber for it. Put up a sign that shows the water isn't drinking water. Rainwater for pools and gardens
Wellpoints and boreholes
The City requires you to register a borehole or wellpoint. Email water@capetown.gov.za. The City sends you a free sign to put up where people can see it. During water restrictions, the sign shows inspectors that you aren't using municipal water. The Level 1 rules
Estates and body corporates
Many estates have their own rules, and they are often stricter than the City's. Two examples in our area:
- Big Bay (Big Bay Residential Estate HOA): tanks, filters and pumps may not be visible from any road or public open space. Exposed pipes must be in earthy colours, not white.
- Atlantic Beach Estate, Melkbosstrand: rainwater tanks need the estate's permission first, with a placement plan and the tank's size, design and colour. Above-ground tanks must be beige, slender and completely screened from the street and the golf course.
Ask your estate or body corporate for its rules before you order a tank. We check them at the survey, and we can suggest slimline or screened tanks.
What we check for you
At the survey we check the tank size, the stand height, your estate's rules and whether the system needs backflow protection. Your written quote says whether you need plans, an RPZ valve or an alternative water application. Larger jobs come with a plumbing certificate of compliance (CoC). How a job works
Questions
Do I need building plans for a 5,000 litre water tank?
Not for a standard plastic 5,000 L tank on the ground. The City's Building Control Officer can still ask for plans for any tank installation if they think it needs them.
Do I need plans for a 10,000 litre tank?
Only if the single tank holds more than 10,000 litres, or stands on a structure more than 1 metre above the ground. Check the rated capacity on the tank: some tanks hold a little more than the size they are sold as.
Do two linked 5,000 litre tanks need building plans?
The City's guideline counts each tank on its own ("per single tank"), so two linked 5,000 L tanks on the ground don't meet the 10,000 L trigger. The Building Control Officer can still call in any installation.
How much does a building plan for a water tank cost?
The City's minimum fee for minor building work in 2026/27 is R680 for a home and R1,100 for other buildings, including VAT. Drawings, and an engineer where one is needed, cost extra.
Do I need the City's approval for rainwater plumbed into my house?
Yes. Apply to install and use an alternative water system. You need backflow protection (an RPZ valve or an air gap), a registered plumber and signs, and a City inspector checks the system.
Sources
- City of Cape Town, Guidelines for the Installation of Alternative Water Systems (PDF), 2019, updated 2021, pp. 30–31 and 37–38.
- City of Cape Town, Apply to install and use an alternative water system.
- City of Cape Town, Building Development Management tariffs 2026/27 (PDF), and Apply for a building plan.
- City of Cape Town, 2026/27 budget, service standards (PDF), and Building Development Management business rules (PDF).
- City of Cape Town, Register a borehole or wellpoint.
- Big Bay Residential Estate HOA, Frequently asked questions; Atlantic Beach Estate, Architectural Design Manual (PDF), June 2024, s.19.12.